2007-21 installation of waterline across Municipal Road
THE CORPORATION OF THE TOWNSHIP OF GORDON
BY-LAW NO. 2007- 21
Replacing by-law no. 93-08
A By-law setting the conditions for installation of a waterline across a road allowance
WHEREAS under Section 309 3) of the Municipal Act RSO 1980 Chapter 302, as amended, authority is granted to Council to permit installation of pipe under their highways, to have such installations maintained and to charge a fee;
NOW THEREFORE The Council of The Township of Gordon and Allan West enacts the following:
1. All landowners wishing to install a waterline across a road allowance must make application for a “Waterline Permit”
2. Standard procedure for all waterlines crossing a road must be installed a minimum of five (5) feet below the road surface or on bedrock and not disrupting the road surface.
3. All waterline installations must be installed under the supervision of the Municipality’s Road Superintendent.
4. a) If the road is hard surface treated the landowner must bore a four (4) inch hole five feet under the road surface to accommodate the waterline and the encasement.
b) If it is not possible to install waterlines without disrupting the surface, compaction and requirements for patching and future surface treatment of the road must be followed under the recommendations of the Road Superintendent
5. All waterlines must be encased in a 4” diameter pipe.
6. Maintenance of this waterline is the responsibility of the landowner.
7. Schedule I, the “Waterline Permit” forms part of this by-law.
8. Schedule II, the “Fee Schedule” forms part of this by-law.
This bylaw shall come into force at the time of its passing by Council
READ A FIRST, SECOND AND THIRD TIME PASSED IN OPEN COUNCIL
The 14th day of August , 2007
______________________ ________________________
REEVE: Art Madore CLERK: Carrie Lewis
Schedule I to By-law No. 2007-21
THE CORPORATION OF THE TOWNSHIP OF GORDON
WATERLINE PERMIT
(Installation of waterline across road allowance)
By-law 2007-21
Date______________________ No.__________
Applicant:__________________________
Mailing Address:_____________________________________
_______________________________________
Location of Waterline Installation
Township_____________________ Concession_____________Lot No.___________
Plan No._________________________________
All Waterlines must be a minimum of 5 feet below the Road Surface or on Bedrock
(Exceptions can be made only if unable to drill below road)
Encasement – minimum of 4 inch in diameter
Encasement length _______________________
Other requirements ________________________________________________________
Installation of Waterline Approved ________________ Not Approved____________
__________________________________________
Road Superintendent
__________________________________________
Signature of Applicant
Fees $100.00 if boring under road{surface treatment}
$500.00 if disrupting the surface
Schedule II to By-law No.2001-21
THE CORPORATION OF THE TOWNSHIP OF GORDON
‘FEE SCHEDULE”
Waterline Permit …………………………………………………$ 100.00 if not disrupting road surface
Waterline Permit ………………………………………………….$ 500.00 if disrupting road surface